It takes man A 6 days to a piece of  work. It takes man B 4 days to do   the same piece of work. How many  days will A and B take to do the  same piece of work?

$$\mathrm{It}\:\mathrm{takes}\:\mathrm{man}\:\mathrm{A}\:\mathrm{6}\:\mathrm{days}\:\mathrm{to}\:\mathrm{a}\:\mathrm{piece}\:\mathrm{of} \\ $$$$\mathrm{work}.\:\mathrm{It}\:\mathrm{takes}\:\mathrm{man}\:\mathrm{B}\:\mathrm{4}\:\mathrm{days}\:\mathrm{to}\:\mathrm{do}\: \\ $$$$\mathrm{the}\:\mathrm{same}\:\mathrm{piece}\:\mathrm{of}\:\mathrm{work}.\:\mathrm{How}\:\mathrm{many} \\ $$$$\mathrm{days}\:\mathrm{will}\:\mathrm{A}\:\mathrm{and}\:\mathrm{B}\:\mathrm{take}\:\mathrm{to}\:\mathrm{do}\:\mathrm{the} \\ $$$$\mathrm{same}\:\mathrm{piece}\:\mathrm{of}\:\mathrm{work}? \\ $$

Answered by tanmay.chaudhury50@gmail.com last updated on 29/Dec/18

A perform (1/6)th portion in 1day  B perform (1/4)th portion in 1 day  A+B perform ((1/4)+(1/6))=(((3+2)/(12)))=(5/(12)) in 1 day  so A+B complete work in(((12)/5))days together

$${A}\:{perform}\:\frac{\mathrm{1}}{\mathrm{6}}{th}\:{portion}\:{in}\:\mathrm{1}{day} \\ $$$${B}\:{perform}\:\frac{\mathrm{1}}{\mathrm{4}}{th}\:{portion}\:{in}\:\mathrm{1}\:{day} \\ $$$${A}+{B}\:{perform}\:\left(\frac{\mathrm{1}}{\mathrm{4}}+\frac{\mathrm{1}}{\mathrm{6}}\right)=\left(\frac{\mathrm{3}+\mathrm{2}}{\mathrm{12}}\right)=\frac{\mathrm{5}}{\mathrm{12}}\:{in}\:\mathrm{1}\:{day} \\ $$$${so}\:{A}+{B}\:{complete}\:{work}\:{in}\left(\frac{\mathrm{12}}{\mathrm{5}}\right){days}\:{together} \\ $$

Answered by aseerimad last updated on 29/Dec/18

Commented by aseerimad last updated on 29/Dec/18

oh srry..tanmay sir already answered.

$${oh}\:{srry}..{tanmay}\:{sir}\:{already}\:{answered}. \\ $$